Mango Processing Unit

Ratnagiri
Arquitectos
Flying Elephant Studio
Ubicación
Mirjole Industrial Estate MIDC, Kolhapur Road, 415639 Ratnagiri
Año
2004
Client
Exotic Fruits Ltd.
Architects
Kiran Chandra, Ceejo Cyriac, Rajesh Renganathan
Structure
Manjunath & Co
MEP
NV Rao, MD Deshmukh
Contractors
Anand Patil

Adaptive use of a self-supporting proprietary roof system eliminates the need for high maintenance structural trusses in the process hall interior.

A passive ventilation system incorporates low 'horizontal' window strips for air intake with helical metal air extractors on the roof driven by natural drafts. This arrangement, along with the shade provided by standing metal roof seams, permits a comfortable work space even during the hot humid summer season.

Separation of 'skin' and 'structure' not only facilitates ventilation of this seemingly windowless building, but also provides a sheltered corridor for running services piping that can be accessed easily even during heavy monsoon rains.

Proyectos relacionados

  • Shanghai Suhe MixC World
    KOKAISTUDIOS
  • Welcome to the Stage!
    Kjellander Sjöberg
  • Hovering Kan-Too – Great Bay Area Center Showroom
    Wutopia Lab
  • Stockwell-Rodríguez Residence
    Belmont Freeman Architects
  • Haunsbergstraße | 1. Preis
    Architektinnen Schremmer.Jell ZT GmbH

Magazine

Otros proyectos de Flying Elephant Studio

800 Jubilee
Hyderabad
Pavilion House
Bangalore
GMR - Schulich School of Business
Hyderabad
APF School and District Institute
Yadgir
2DC817 Studio House
Bangalore